---
title: How They Built the Pyramids: Reed Conveyor Belts Logistics
description: Logistics guide for How They Built the Pyramids: crafting woven reed conveyor belts, powering junctions, and building a 100-tile transport network.
url: https://howtheybuiltthepyramids.wiki/automation/conveyor-belts/
---

### Quick Summary: Woven Reed Conveyor Systems
**Woven Reed Conveyor Belts** represent the arterial logistics network of **How They Built the Pyramids**. Crafted from papyrus fibers and bronze roller pins, conveyors eliminate the need for manual stone hauling between river quarries and the pyramid base. Connected to a [32 RPM power drive shaft](https://howtheybuiltthepyramids.wiki/automation/shafts-and-rpm/), belts transport **1 stone block per second**. Laying an uninterrupted chain of **100 active conveyor tiles** unlocks the _Reed Highway_ achievement.

- Woven reed conveyors require papyrus fibers and bronze roller pins.

- Belts carry 1 block per 2 seconds at base shaft speed (16 RPM).

- Laying 100 continuous active conveyor tiles completes the Reed Highway achievement.

- Inclined conveyor ramps require cleats to prevent stone blocks sliding back.

## How They Built the Pyramids 100-Tile Belt Logistics Network

In early pyramid construction stages, players personally haul limestone blocks or assign individual [Shabti helpers](https://howtheybuiltthepyramids.wiki/shabtis/market-and-hiring/) to carry stones across the sand. However, as the construction site expands across hundreds of square meters, transport latency becomes the single greatest limitation on building speed.

The solution lies in the **Reed Highway**. By linking papyrus conveyor lines from the riverbank clay pits and stone saws directly to Course 1 and Course 2, materials flow continuously into builder hands. Laying an unbroken chain of 100 active conveyor tiles immediately triggers the _Reed Highway_ achievement.

### Reed Highway Achievement Requirements:

- **Continuous Chain:** Exactly 100 connected conveyor belt tiles in an unbroken, linked line.

- **Kinetic Engagement:** All 100 tiles must be actively powered by a connected drive shaft (minimum 8 RPM).

- **Payload Verification:** At least one stone block or mud brick must travel across the 100th tile.

- **Network Breadth:** Branching loops and splitter junctions count toward total tile density as long as the primary trunk remains uninterrupted.

To prevent bottlenecks at the pyramid staging area, integrate your 100-tile network with [material splitters and directional filters](https://howtheybuiltthepyramids.wiki/automation/splitters-and-filters/).

## How They Built the Pyramids Belt Crafting and Throughput Speed

Conveyor belt throughput is strictly tied to the rotational kinetic energy of the driving shaft. The following table provides full speed, capacity, and material recipes for all conveyor variants in release v1.0.3:

| Conveyor Belt Tier / Type | Crafting Recipe (Per Tile) | Throughput at 16 RPM | Throughput at 32 RPM (Max) | Optimal Usage Scenario |
| --- | --- | --- | --- | --- |
| **Standard Woven Reed Belt** | 4 Papyrus + 2 Rollers + 2 Bronze Pins | 0.5 Blocks / sec (1 every 2s) | 1.0 Blocks / sec (1 every 1s) | Horizontal long-distance transport from quarries |
| **Cleated Incline Belt** | 4 Papyrus + 2 Rollers + 4 Timber Cleats | 0.4 Blocks / sec | 0.8 Blocks / sec | Vertical ramps up to 45-degree slope angle |
| **Heavy Roller Bed (Reinforced)** | 6 Papyrus + 4 Bronze Bearings | 0.6 Blocks / sec | 1.2 Blocks / sec | Buffer staging zones under heavy stone drop chutes |

Notice that stepping up shaft speed to 32 RPM doubles transport velocity. For instructions on building 3:1 step-up gearboxes, consult the [32 RPM Drive Shafts Guide](https://howtheybuiltthepyramids.wiki/automation/shafts-and-rpm/).

## How They Built the Pyramids Inclined Ramps and Cleated Belts

As construction climbs from Course 1 up to Course 10, delivering stone blocks vertically becomes critical. Standard flat conveyor belts lack adequate surface friction; once a conveyor rises above a 15-degree angle, 2.5-ton limestone blocks lose grip and slide backwards, causing catastrophic pile-ups at the ramp base.

- **Timber Cleat Upgrades:** Upgrading flat belts to Cleated Incline Belts adds transverse wooden ridges every half meter. These cleats mechanically lock against the bottom edge of limestone blocks, allowing secure transit up 30 to 45-degree inclines.

- **Incline Torque Demands:** Lifting heavy stone against gravity requires 50% more kinetic torque than horizontal transport. Connect high-torque ox capstans or double-geared waterwheels to drive inclined ramp sections.

- **Transition Landings:** Install a 2-tile flat buffer section at the summit of every incline before diverting blocks onto upper scaffolding tracks.

Once construction rises past Course 15, inclined conveyor ramps become impractically long. At this stage, transition your vertical logistics to high-altitude [siege trebuchets and catapults](https://howtheybuiltthepyramids.wiki/automation/trebuchets-and-catapults/).

## How They Built the Pyramids Reed Conveyors FAQ
How do you unlock the Reed Highway achievement in How They Built the Pyramids? Lay an unbroken, continuous logistics network of 100 or more active woven reed conveyor belt tiles transporting stone blocks across your site to unlock the Reed Highway achievement.

What materials are required to craft reed conveyor belts? Each conveyor segment requires 4 woven papyrus reed bundles, 2 timber rollers, and 2 bronze roller pins crafted at the Carpentry Bench.

How does drive shaft RPM affect conveyor belt transport velocity? At 16 RPM, a conveyor transports 1 block every 2.0 seconds; accelerating the driving shaft to 32 RPM doubles belt speed to 1 block per 1.0 second.

Why do stone blocks slide backwards on steep conveyor ramps? Conveyors exceeding a 15-degree incline require cleated reed belts; un-cleated belts lack frictional grip, causing 2.5-ton limestone blocks to tumble backwards.

## How They Built the Pyramids Conveyor Logistics Sources

Conveyor dimensions, speeds, and achievement milestones have been verified against live client engine data:

- **Source 1:** Advanced Automation, Drive Shafts, Belts & Shabti Setup Guide — Video transcript verification (release v1.0.3).

- **Source 2:** In-Product Logistics Network Telemetry — Reed Highway 100-tile achievement logic.

- **Source 3:** Steam Community Global Achievement Stats — Verified player completion metrics for the Reed Highway.

Explore advanced routing in our [Splitters & Filters Guide](https://howtheybuiltthepyramids.wiki/automation/splitters-and-filters/) or review all systems in the [Automation Hub](https://howtheybuiltthepyramids.wiki/automation/).
